22
The closure was bonded/sealed to the end of the rolled trim (overlapped by 50mm) with Fix ALL adhesive, and the trim was then nailed to the roofing deck. Cover the corner trims with tape and resin
The closure was bonded/sealed to the end of the rolled trim (overlapped by 50mm) with Fix ALL adhesive, and the trim was then nailed to the roofing deck. Cover the corner trims with tape and resin